The MEP design and installation of the reception to the ABC Building refurbishment at White Rose Office Park, Leeds.
The MEP design and installation of a new build 125,000sqft Office and Laboratory Building.
The MEP design and installation of the office suite refurbishment at White Rose Office Park, Leeds
The MEP design and installation of the 4 floor Multi Storey Car Park at the Thorpe Park Development.




