MEP Design and Installation – Refurbishment Works
KNG were employed as the MEP design and installation contractor for the strip out and install of the existing 1 story office block at the White Rose Office Park, Leeds.
Following the principal sustainability plan for the development, the refurbishment achieved an EPC A rating, ready for tenant occupation.
