MEP design and installation contractor

The MEP design was developed during the pre-construction phase to adopt the tenant fit out requirements, minimise disruption and remove duplicate costs for the benefit of the client and tenant.

KNG delivered this integrated CAT A and CAT B design as the UK was exiting the Government Covid 19 restrictions. With a secured tenant for the building the Client required a design solution that incorporated the tenant specification for Standby Generation, UPS and Gas Suppression systems in addition to enhanced ventilation and lighting designs.

Being a trade contract package direct to the Calderdale Council, KNG incorporated the design and installation of the vertical transportation systems in addition to the more traditional MEP services.