MEP design and installation contractor

The MEP design and installation of the final phase office block for single tenant occupation on a restricted city centre site.

KNG faced several challenges in the development of the design and installation of the MEP services on this project. The site area was no larger than the footprint of the building, making the storage of materials and plant impossible, therefore a just in time delivery operation was required with immediate craneage of roof mounted equipment.

Secondly the sprinkler system required throughout the building restricted the route of other services installations through the detailed structural steel elements, utilising the castellations for major service runs.