MEP Design and Installation – Refurbishment Works

KNG were employed as the MEP design and installation contractor for the refurbishment of the existing 3 story office block with roof top plantroom at the White Rose Office Park, Leeds.Following the principal sustainability plan for the development, the refurbishment achieved an EPC A rating. 

KNG removed all the existing wet services including storage tanks, chillers and boilers.  The project replaced existing services with point of use water heaters, VRF heating and cooling systems and a ground mounted Solar PV array.